Turnkey electrical for Unit W, the baseball and softball concessions, restroom, and storage building at the Van Alstyne Athletics Complex: underground secondary feeders, main distribution, branch power and lighting, exit and emergency lighting, and lighting controls.
Electrical work for five rooftop HVAC unit replacements and a Daikin VRV system at the Clyde W. Cosper Texas State Veterans Home in Bonham, performed for HTS with Falkenberg Construction as the prime general contractor.
For the Texas Historical Commission, Koryente replaced all 29 pendant lights in the pavilion at San Felipe de Austin State Historic Site after their vapor barrier failed, installing new LED fixtures and a Lutron Pico dimming control so staff can adjust the light level.