A site lighting project starts with how the space is used: drive lanes, parking rows, walkways, and any areas with particular safety or security concerns. Pole height, spacing, and fixture selection follow from that layout, not from swapping in a brighter fixture wherever the old one failed.
Koryente reviews the existing poles, wiring, and electrical service first, since a full LED retrofit, a partial fixture upgrade, and new poles and circuits each suit different starting conditions. The same approach guided Koryente's site lighting and dimmer-switch work at the San Felipe de Austin Historic Site and the illuminated athletic-complex sign at Van Alstyne High School.